1. Construction of Sluice Regulator Structure on Chhaprabhatha Khadi

Brief details

Name of Work Construction  of  Sluice Regulator  Structure  at Chhapra bhatha Khadi on the  right bank of  the  River Tapi
River/Khadi Tapi/Chhaprabhatha khadi
Nearest village Chhaprabhatha
Approach to site by road 1.2 km from Amroli bridge on Chhaprabhatha road

Hydrology

Catchment area 26.82sq.km (10.35 sq. mile)
Length of Khadi  
Design flood 1 in 100 600.00 cumecs

Sluice Gate

Type M.S vertical lift gate
No & size of gates 7 nos. and 2.13m x 2.74m
Nos. pier/ span 6 piers and 7 spans
Crest R.L. R.L +6.00 m
Top of Gate R.L 8.74m
Top of sluice regulator R.L +17.83m
Length of Apron 7.50 m
Top of Apron R.L +4.00 m
Counter fort wall 2Nos of 10 m wall on both the side of structure

Approaches

Type Proposed New earthen bund(both side of the structure)
Total Length Total 130.00 m (65.00 m on both side of the structure)
Top R.L. of Bund/Road R.L +17.83m
Top width of Bund/Road 4.5m

Estimated Project cost

Rs.8.84 Crores.


Objective

These will relief about 2.00 lac population of the Amroli, Chhaprabhatha, Kosad etc areas during flood situation.



2. Rubber Balloon Barrage Project


Concept

Weir - cum - causeway project was built in 1995 on river Tapi at the approx. cost of Rs 35.00 Cr. Due to decrease and irregularly scattered rainfall pattern and new construction of dams/weir/barrages over river Tapi after 1998, water storage in Ukai Dam has been also effected. This decrease in river flow resulted in to heavy silting in down steam of Weir-cum-causeway. Considering future water supply requirement, conservation of water and other aspects, it has been decided to think over the project of Balloon Barrage on river Tapi near Rundh at 2.0 km u/s of Magdalla Bridge. The option of conventional barrage is also under consideration.Weir - cum - causeway project was built in 1995 on river Tapi at the approx. cost of Rs 35.00 Cr. Due to decrease and irregularly scattered rainfall pattern and new construction of dams/weir/barrages over river Tapi after 1998, water storage in Ukai Dam has been also effected. This decrease in river flow resulted in to heavy silting in down steam of Weir-cum-causeway. Considering future water supply requirement, conservation of water and other aspects, it has been decided to think over the project of Balloon Barrage on river Tapi near Rundh at 2.0 km u/s of Magdalla Bridge. The option of conventional barrage is also under consideration.


Estimated Project cost

Rs. 150 Crore


Objectives

  • To conserve excess water flowing away from Weir-cum-Causeway
  • Long term water supply requirement of the Surat city and surrounding area.
  • To prevent tidal silting and pollution in Tapi river - down stream of Weir-cum-Causeway
  • To prevent salinity intrusion in area like Adajan, Athwa, Umara etc located d/s of Weir-cum-Causeway.
  • Ground water recharge from sweet water reservoir and improvement of ground water quality
  • Development of water sports like, Boating, Swimming, Cruise, Para sailing etc
  • River front development like, stepped garden, river drive road, cycle/ jogging/ walking tracks
  • Development of amusement park and recreational spots.
  • To improve environment and aesthetic beauty of the city.


3. SMC Main Administrative Building


Surat Municipal Corporation has planned to construct a new administrative building at old sub-jail location on ring road. The plot area is of around 22,100 sqm. The purpose of construction of SMC new administrative building is to built co-ordination between the various department who are presently at different locations across the city due to the lack of space in headquarter at Muglisara. Also in the rainy season, due to heavy traffic on main road at Muglisara, it is very difficult to reach the headquarter and it consumes much more time and works get delayed.

The proposed building will be constructed based on Green Building Principles. SMC has shortlisted 12 Architects/Consultancy firms based on Expression of Interest submitted by them. Out of shortlisted 12 Architects/Consultancy firm, SMC is in process to finalize the Architect/Consultancy firm who will design this building based on Green Building Concept.

Expected construction time for completion of this project is of three years. The construction will start around Mid of year 2016.

The preliminary block project cost will be of Rs. 125 crores



4. Surat Metro Rail


Surat city is the fastest growing city of the Gujarat State with population +5.5 million and having area of 326.515 sq. km. Last decadal growth of population is 55 %.

For Surat City, Surat Municipal Corporation is acting as a local Government for basic facilities and infrastructural facilities like road, bridges, transportation etc. Numbers of vehicles in the city are also increasing rapidly. As per available information, growth rate of vehicles in Surat city is more than 12 %. SMC has taken necessary steps of speedy and smooth traffic movement by constructing fly over bridges over road junctions. To construct fly over bridges is not ultimate solution for mass transit system, but is utmost important and necessary to have a planning and vision for Metro rail system for the overall development of the city.

Government of Gujarat decided to take steps to implement MRTS in cities having population more than 2 Million. As a part of this decision, Metro Rail Project for Surat is being initiated as the city population is more than 5.5 million.

Surat Municipal Corporation in association with Gujarat Urban Development Company (GUDC) Ltd., Gandhinagar has given the consultancy work to Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Ltd. The preparation of detailed project report (DPR) for feasibility of Surat Metro Rail is awarded to Delhi Metro Rail Corporation (DMRC) through MEGA Co. Ltd.



5. Surat Railway Station Re-development


The development of Surat Railway Station in to an International Standard has been initiated by the Indian Railway Station Development Corporation (IRSDC) in association with Gujarat State Road Transport Corporation (GSRTC) and Surat Municipal Corporation (SMC).

Surat Municipal Corporation has prepared a concept plan with physical model for Surat Railway Station to create world class facilities to an International Standard not only limited to development of Railway Station but also the whole area around the Surat Railway Station.

The railway properties on eastern side with railway housing currently, railway yard on west side and GSRTC depot plots (on east and west side) may be used as a part of this development. Project components like Integrated transit facilities at elevated levels, travellators for passenger interchange, High density/ mixed use development with higher FSI have been explored and proposed. CEPT, Ahmedabad is a common consultant for this project for IRSDC, GSRTC and SMC.

Project will be implemented based on PPP model.

The preliminary block project cost will be of Rs. 2,444 crores.